|
Who's Online
There currently are 5815 guests and 2 members online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
Great salespeople, muuito attentive recommend everyone buy this site.Obrigado by atendomento..
;
everything was fine - fast, readable, worth the price
;
I'm happy to get a manual from this rare old amp. The pdf is from good qualty.
;
very quick service and manual as described - would happily trade here again!
;
Fast Download,all pages present,an excellent copy.THis enabled to find the origional part numbers and chase them up. The cartridge is proving difficult to find but at least I know the origional part number.Thanks to all.
Disassembly
4-6-3 Roll Pinch
1. Before you disassemble the roll pinch, you should remove: � OPE Unit (see page 4-9) 2. Remove the four screws securing the OPE unit.
4-6-4 OPE PBA
1. Before you disassemble the OPE PBA, you should remove: � OPE Unit (see page 4-9) 2. Remove the four screws securing the OPE unit.
3. Turn the upper scan frame of the OPE unit over. 4. Remove the three screws and take out the spring pinch. Then take out the roll pinch.
3. Remove the nine screws and take out the PBA and LCD.
Spring pinch
Upper scan frame
Roll pinch
MC-Service
Samsung Electronics
Notes: � Do not turn the OPE unit upside down after you remove the screws securing the PBA. Keys and rubber contacts may be separated and easily lost. � When you reassemble the OPE unit, make sure the keys are in correct position. � When you reassemble the PBA, secure the screws according in the order of the number printed on the PBA. � After reassembling, operate the machine to make sure it works properly. � After reassembling, make sure the LCD is not blocked.
4-11
|
|
|
> |
|